Building Scaffold
The components of the scaffolding are produced by the process of metal stamping, piercing, embossing and bending


Scaffolding integral parts:

- steel seamed tubing Ô48,30 x 3,0-3,6 mm;

- fixed clamps - for holding two tubes Ô48,30 mm under right angle;

- roto clamps - for holding two tubes Ô48,30 under angle from 0 to 360°;

- extension - to extent two tubes of Ô48,30 on the place of knots;

- pedal - to bring vertical loads from the scaffolding to the ground.

The use of the building scaffolding is very wide. Its assembling and disassembling are simple and fast, without the usage of a crane but with essential professional skills of the construction worker. It is used in performing masonry and facade works during building process, for maintaining height equipment in other industries and also during production of supporting construction. Storing and transport are simple and fast because it takes little space and the elements are very light.
Specification for building scaffold elements of 500 m2:
Position
Element's description
Measure
Quantity
1
Tube Ô48,30 x 3,6 mm
m'
1500
2
Fixed clamp
pieces
672
3
Roto clamp
pieces
76
4
Extension
pieces
232
5
Pedal
pieces
20

Total mass is 7550 kg.
The length of tubes can be changed by request of the buyer.
Play Video
The mission of MZT Enginering- Bitola is to continue and strengthen the cooperation with the main world manufacturers of industrial equipment.
Design by X3M Labs